Louisville Arena (KY) Design/Construction New Facility 11 August 2010
Sector: Sports Venue
New basketball and public events arena for downtown Louisville, recently names the KFC Yum! Center.
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.

East Providence Wastewater Trmt Upgrade, O&M In Operation Substantial Alteration of Existing Facility 11 August 2010
Sector: Wastewater
10 year concession arrangement between City and United Water to take over O&M of existing wastewater treatment facilities, to make $50+Million in capital upgrades over the next two years, and to then ...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

Santa Paula Water Treatment Facility In Operation New Facility 11 August 2010
Sector: Water
4 MGD membrane bioreactor facility design, built, and financed through a 30 year concession to private operator/developer. The high tech, fully automated facility includes state of the art odor abate...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

Alta Wind Energy Center Design/Construction New Facility 10 August 2010
Sector: Energy Generation
1,550 megawatt, $2.6 billion, wind farm under development near Mojave, CA. Terra-Gen Power LLC broke ground in July 2010 on what will be the world's largest wind-power project. When fully developed ...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

I-635 LBJ Express Project Design/Construction Substantial Alteration of Existing Facility 10 August 2010
Sector: Transportation, Roads
$2.7 billion dollar makeover of 13 miles of I-635 in the Dallas Fort Worth area -- which will add up to six express toll lanes. The LBJ Infrastructure Group - a consortium led by Cintra -- will desig...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

Ridgecrest (CA) Naval Technology Center Design/Construction New Facility 10 August 2010
Sector: Other Government Building
P-745 Weapons Armament Technology Center at the Naval Air Weapons Station (NAWS) China Lake. Mojave desert technical and management support offices, general engineering laboratories, information faci...
All Public Finance. Public Sponsor contracts for both initial design and construction with a single entity. Public Owner operates and maintains the resulting facility.

Mountlake Terrace Freeway Bus Station Design/Construction New Facility 10 August 2010
Sector: Transportation, Transportation Terminal, Roads, Other Government Building
Innovation design and positioning of large capacity park and ride facility on I-5 north of Seattle Washington. Built jointly by Washington State DOT and Sound Transit, the bus station is in the media...
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.

I-5 Everett (WA) HOV Addition Snohomish Cty In Operation Substantial Alteration of Existing Facility 10 August 2010
Sector: Transportation, Roads
Widening of I-5 in a 10 mile section between SR526 and US 2, including the addition of an extra mergin lane between 41st and US 2, and 10 miles of new HOV lanes north and southbound from the Boeing Fr...
All Public Finance. Public Sponsor contracts for both initial design and construction with a single entity. Public Owner operates and maintains the resulting facility.

Regiotram Groningen Project Definition/Programming New Facility 06 August 2010
Sector: Transportation, Transit
A DBFMO contract for two greenfield tram lines in the city of Groningen
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

East Corridor FasTracks to Denver Airport Project Definition/Programming New Facility 22 June 2010
Sector: Transportation Terminal, Rail, Transportation
22.8 mile electrified commuter rail line from Denver Union Station in downtown Denver to Denver Int'l Airport (DIA).
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

Hudson Ranch Geothermal Plant Design/Construction New Facility 22 June 2010
Sector: Energy Generation, Energy Distribution
49 Megawatt geothermal plant near Salton Sea (Niland, CA), authorized by the Imperial Irrigation District. Electricity will be sold to Phoenix area, supplying 35,000 individuals with power. Utility ...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

Second Avenue Subway (NYC) Design/Construction New Facility 22 June 2010
Sector: Tunnel, Transportation Terminal, Transportation, Transit
Rapid transit line along the Eastern edge of Manhattan underneath Second Avenue. Planned (but not built) for more than 75 years, contract to build the 8.5 mile line was awarded in 2007. Phase I of t...
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.

New Terminal St. Petersburg Pulkovo Airport Project Definition/Programming New Facility 21 June 2010
Sector: Transportation Terminal, Airport, Transportation
New terminal at St. Peterburg, designed to double capacity from 7 million pax per year to 14. The project is being supported by European Bank for Reconstruction and Development, and is claimed to be ...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

Shepherds Flat Wind Farm Design/Construction New Facility 20 June 2010
Sector: Energy Generation
845 MW wind farm in development near Arlington, Oregon, to generate enough electricity for 211,000 homes. The project is being privately developed on private land, and is comprised of 303 wind turbin...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

Retractable Roof for BC Place Design/Construction Substantial Alteration of Existing Facility 20 June 2010
Sector: Sports Venue
$458 million replacement of teflon inflatable roof with a new retractable roof: the largest cable supported retractable roof in the world. BC Place is home to the BC Lions CFL football team, and was...
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.

Lucas Oil Stadium Project (Indianapolis) In Operation New Facility 20 June 2010
Sector: Sports Venue, Convention Center
$720 million, six-level stadium with retractable roof, seating 63,000 for football, 70,000 for basketball, covering 1.8 million square feet with 137 suites. Home to the NFL Colts, and host to numerou...
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.

Indiana Convention Center (Expansion) Design/Construction New Facility 20 June 2010
Sector: Convention Center, Sports Venue
Fourth expansion to the Indiana Convention Center since 1972, this $275 million project will be built on the site of the old RCA Dome in Indianapolis (now demolished). An indorr street level, climate...
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.

New Meadowlands Stadium Design/Construction New Facility 03 June 2010
Sector: Sports Venue
The new $1.6 billion football stadium for BOTH the NFL New York Jet and the New York Giants, with a seating capacity of 82,500, 200 luxury suits, and a number of club seats. The playing surface will...
Public Sponsor contracts for initial design, construction, and for long term operations and maintenance with a single entity. At the end of the term, Public Sponsor regains control of the facility.

New Federal Courthouse (Austin, TX) Design/Construction New Facility 03 June 2010
Sector: Other Government Building
230,000 sqft federal courthouse in downtown Austin, occupying a full city block west of Republic Square. A highly compact, complex cubic building form with eight stories -- the building will have 8 c...
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.

Repainting Brooklyn Bridge (NYC) In Operation Repositioning of Existing Facility 03 June 2010
Sector: Transportation, Roads, Bridge
$500 million facelift for the Brooklyn Bridge, originally designed by John A Roebling, and built between 1870 and 1883. The bridge was last repainted in 1991, and will be sandblasted in enclosed unit...