Project Details

✔ Project has been published!

Results Chart for Delivery Method and Financing

Delivery Method

DBB/CMAR
# of Projects: 1
100% of the Results

Background informationProject Created: February 22, 2010

Project Name: Arrowhead Tunnels Southern CA
Year in Operation: 2009
Sector: Water & Waste
Subsector: Water
Status: In Operation
Type: New Facility
Description: Emergency water supply for Metropolitan Water District of Southern California's Inland Feeder system. The Arrowhead Tunnels project consists of two 19-foot excavated-diameter tunnels (East 6 miles, West 5 miles), with pre-cast concrete liners, and steel pipes. The tunnel liner's design is to withstand a magnitude 8.0 earthquake.
Delivery Method as described in the country where it's located: Design Bid Build
Is the project still active: Yes
Comments: The tunnel alignment crosses active portions of the San Andreas fault in three locations, and was installed using tunnel boring machines. The Inland feeder system extends connections to the Colorado River Aqueduct.

Project Locations

Address:
City: San Bernardino
State: California
Country: United States of America

Souces of Project Support (Non-monetary)

Checkbox Checked Access to Land: Tunnel project for Metropolitan Water District of Southern California. ROW provided by MWD.

Souces of Project Support (Monetary)

Checkbox Checked

From Public (Government) Sources to Producers: Project funded directly by MWD. Design team led by Jacobs Engineering. Main contractor - Shea-Kenny. Tunnel subcontractor Traylor-Shea-Ghazi, with detailed design of segmental lining by Halcrow. A special lining was also developed that allowed the use of a grout bag on the outside of the lining, to form an external seal between the lining and the rock in areas of high water flow.

Project Delivery & Finance Method

Project Delivery:
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.
Construction Manager At Risk Variants: Public Sponsor contracts with Construction Contractor after Design is Complete.

Procurement Approach

Project Component
Qualifications
Based Selection
Request for
Qualifications
Request for
Proposals
Invitation
for Bids
Unsolicited
Proposals
Design
X

Term for Key Components & Forms of Contract

Project Component
Years
Quarters
Initial Design and Construction
5
0
Forms
Description
Other
MWD format. 

Project Value (If and As Known)

Date of Estimated Project Value: February 22, 2010
Project Value
Hard Cost
Hard & Soft Costs
Construction
$250 Million - 1 Billion US
(none)
Total
$200-500 Million US
(none)