Project Details

✔ Project has been published!

Results Chart for Delivery Method and Financing

Delivery Method

DBB/CMAR
# of Projects: 1
100% of the Results

Background informationProject Created: February 19, 2011

Project Name: Johns Pass Bridge
Year in Operation:
Sector: Transportation
Subsector: Bridge
Status: Design / Construction
Type: Substantial Alteration of Existing Facility
Description: The proposed improvements involve replacing the existing bascule bridges with low-level, twin-span bascule bridges on the same alignment. The new bridges will increase the horizontal navigational clearance from 60 feet to 100 feet in width and will provide a 27-foot vertical clearance over the channel without acquiring additional right-of-way. The profile grade will be 5.6 percent and will meet the requirements of the Americans with Disabilities Act (ADA). The typical section includes two lanes of travel in each direction, 8-foot sidewalks, 10-foot outside shoulders, and 4-foot inside shoulders
Delivery Method as described in the country where it's located: Design Bid Build
Is the project still active: Yes
Comments:

Project Locations

Address: 12700 Gulf Blvd
City: St Petersburg
State: Florida
Country: United States of America

Address: 12798 Gulf Blvd
City: St Petersburg
State: Florida
Country: United States of America

Souces of Project Support (Non-monetary)

Checkbox Checked Land: No additional Right of Way (ROW) had to be purchased to support the project. The ROW was previously owned by the Florida Department of Transportation
Checkbox Checked Environmental Clearance: The project was required to secure the following permits: United States Coast Guard (USCG) Permit, United States Army Corps of Engineers (ACOE) Environmental Permit, Southwest Florida Water Management District (SWFWMD) Stormwater Permit, Florida Department of Environmental Protection (FDEP) Generic National Pollutant Discharge Elimination System (NPDES) Permit.

Souces of Project Support (Monetary)

Checkbox Checked

From Public (Government) Sources to Producers: The public sponsors for the project were both the Federal Government and the State of Florida

Arrow Right
Checkbox Checked

Credit Enhancements: Monetary support was provided through federal and state bridge replacement grants and loans gathered from 2000 through 2010. Other contributors to the project capital were state bonds and state district dedicated revenue.

Project Delivery & Finance Method

Project Delivery:
All Public Finance. Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner operates and maintains the resulting facility.
Construction Manager At Risk Variants: Public Sponsor contracts with Construction Contractor after Design is Complete.

Procurement Approach

Project Component
Qualifications
Based Selection
Request for
Qualifications
Request for
Proposals
Invitation
for Bids
Unsolicited
Proposals
Design
X

Term for Key Components & Forms of Contract

Project Component
Years
Quarters
Initial Design and Construction
11
0
Forms
Description
 
 

Project Value (If and As Known)

Date of Estimated Project Value: February 19, 2011
Project Value
Hard Cost
Hard & Soft Costs
Feasibility
< $10 Million US
(none)
Design
< $10 Million US
(none)
Construction
< $100 Million US
(none)
Total
< $200 Million US
(none)