Background informationProject Created: October 1, 2019

Project Name: Polcevera Bridge (Morandi Replacement) Genoa
Year in Operation: 2020
Sector: Transportation
Subsector: Roads, Bridge
Status: Design / Construction
Type: New Facility
Description: Emergency replacement of the collapsed Morandi bridge over the Polcevera River in Genoa, Italy. The old bridge collapsed in the Summer of 2018, leaving key commercial and residential section of Genoa cut off from each other. The bridge is part of the A10 motorway, an important connection between Italy and southeastern France. The new bridge was designed by architect Renzo Piano - who offered both his concept and his supervision on the project for free. Piano has suggested that the bridge has a design life of 1,000 years - because of its properly protected steel design, with every piece accessible for repair, repainting, and maintenance. Construction is by a joint venture of Salini Impregilo and (shipbuilder) Fincantieri Infrastructure. The JV - Pergenova - will work with Italferr, the consulting arm of the Italian railway state company, who will handle engineering. The new bridge will have a 3,600 ft main steel deck running across 20 spans, supported by 19 concrete piers, spaced at 164-foot intervals, except for the pair on either side of the Polcevera River, which are 328 feet apart. The bridge is designed to reflect light during the day, and to use stored solar energy to light the structure at night.
Delivery Method as described in the country where it's located: Design Bid Build
Is the project still active: Yes
Comments: The project was procured on an emergency basis following the collapse of the Morandi Bridge in July, 2018.

Project Locations

Address: Ponte Morandi
City: Genoa
State:
Country: Italy, Italian Republic

Souces of Project Support (Non-monetary)

Checkbox Checked Access to Land
Checkbox Checked Environmental Clearance

Souces of Project Support (Monetary)

Checkbox Checked

From Public (Government) Sources to Producers: The official investigation of the reason for the collapse is still ongoing. Bridge operator Autostrade per I'Italia was barred from participating the demolition of the old bridge or the construction of the new bridge. There is an unresolved dispute between the bridge operator and the government as to whether the operator must finance both the demolition of the old and the construction of the new bridge.

Arrow Right
Checkbox Checked

Direct Cash Support: $230 million construction cost estimate

Project Delivery & Finance Method

Project Delivery:
Design Bid Build/Construction Management at Risk (All Public Finance). Public Sponsor contracts for initial design, and separately contracts for initial construction. Public Owner then separately contracts with another party, who operates and maintains the facility.
Construction Manager At Risk Variants: Public Sponsor contracts with Construction Contractor after Design is Complete.

Procurement Approach

Project Component
Qualifications
Based Selection
Request for
Qualifications
Request for
Proposals
Invitation
for Bids
Unsolicited
Proposals
Design
X
Construction
X

Term for Key Components & Forms of Contract

Project Component
Years
Quarters
Initial Design and Construction
2
0
Forms
Description
Other
 

Project Value (If and As Known)

Date of Estimated Project Value: January 15, 2019
Project Value
Hard Cost
Hard & Soft Costs
Design
$10-25 Million US
(none)
Construction
$100-250 Million US
(none)
Total
$200-500 Million US
(none)