Search Results

Results Chart for Delivery Method and Financing

Delivery Method

O & M
# of Projects: 13
100% of the Results

DBB/CMAR

0
(0%)

O & M

13
(100%)

DB

0
(0%)

DBOM All Public Finance

0
(0%)

DBOM Partially Public Finance

0
(0%)

DBFOM All Private Finance

0
(0%)
Total Projects: 637
Total Search Results: 13
% of Total Projects: 2%
Filter Projects By: Project Name | Year in Operation | Sector | Subsector | Status | Type
Year in Operation:
Sector: Transportation
Subsector: Transit, Transportation Terminal
Status: Design / Construction
Type: New Facility
Description: The project involves the design and construction of a 3.2-mile extension of the Bay Area Rapid Transit (BART) system to the Oakland International Airport. The system is an Automated People Mover (APM), a driverless people moving system on an elevated and automated guide way system. The construction of two new stations at each end of the line is also part of the project. The project also involves an Operate and Maintenance contract for a term of 20 years.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 2002
Sector: Water & Waste
Subsector: Wastewater, Water
Status: In Operation
Type: Repositioning of Existing Facility
Description: Contract Operations and Maintenance and operation, in compliance with State and Federal regulations, of 50 miles of water distribution mains, 520 hydrants, 1200 valves, 40 miles of wastewater/sewer mains, 10 miles of drainage piping system, 1300 catch basins, one storm water pump station, throughout the City of Chelsea.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 2004
Sector: Buildings
Subsector: Other Government Building
Status: In Operation
Type: Repositioning of Existing Facility
Description: One in a series of single fiscal year contracts for regular street sweeping/cleaning of all 44 miles of the streets in the City of Chelsea. Sweeping is required twice per month for 10 months of the year (Jan and Feb excepted). One year contract is extendable for two additional one year terms before rebidding required.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 2004
Sector: Buildings
Subsector: Other Government Building
Status: In Operation
Type: Substantial Alteration of Existing Facility
Description: One in a series of single fiscal year contracts for seasonal application of all Pavement Markings in the City of Chelsea, including crosswalks, center lines, lane lines, arrows, RR crossing, safety zones, curbing, sidewalk, roadway warning markings, and parking areas. One year contract is extendable for a second year before rebidding required.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 1992
Sector: Buildings
Subsector: Other Government Building
Status: In Operation
Type: Repositioning of Existing Facility
Description: Series on year to year contracts for fleet maintenance that have been in effect since 1992. Fleet management, preventive maintenance, and repair of City owned vehicles and equipment. The contract requires all labor, parts and equipment required to maintain and repair 49 automobiles, 33 light trucks, 8 medium trucks, 5 pieces of specia equipment, 15 trailers, 1 front end loader, 3 Mad Vacs, and 37 small hand operated power devices.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 2008
Sector: Buildings
Subsector: Other Government Building
Status: In Operation
Type: Repositioning of Existing Facility
Description: One in a series of single fiscal year contracts for weekly (in season) mowing and trimming of all the City's parks, memorials, and green space. Each single year contract is extendable for two additional one year terms, at discretion of City. Three (3) large parks, seven (7) smaller parks and playgrounds, other enumerated open space, plus grass at three (3) municipal buildings. 27 weeks assumed.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 2007
Sector: Buildings
Subsector: Other Government Building
Status: In Operation
Type: New Facility
Description: The project involves the delivery of housing property maintenance and street scene services that include street cleaning, drainage services, high maintenance, weed spraying, catering, removal of abandoned cars, and graffiti removal.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 1997
Sector: Transportation
Subsector: Roads, Bridge
Status: In Operation
Type: New Facility
Description: Long term O&M of 41 meter wide, 2,200 meter long suspension bridge linking Tsying Yi Island to Ma Wan Island off the western shore of Kowloon. Part of the Lantau Link between Hong Kong and the Hong Kong International Airport at Chek Lap Kok. The Lantau Link is tolled. The bridge carries six lanes of traffic on an upper deck and two rail tracks and an additional two lanes of traffic on the sheltered lower deck.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 1997
Sector: Transportation
Subsector: Bridge
Status: In Operation
Type: New Facility
Description: Long term O&M of 750 meter long double deck, cable stayed bridge over Kap Shui Mun channel, comprising six roadway lanes on upper deck, two transit rail lines (MTR to Airport) and two additional roadway lines on lower deck.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.
Year in Operation: 1993
Sector: Transportation
Subsector: Tunnel
Status: In Operation
Type: Repositioning of Existing Facility
Description: Pure Operations and Maintenance Contract for management of pair of tolled 1.4 km long automobile tunnels (2 lanes in each direction) providing service to the Northwest of Kowloon toward Sha Tin.
Project Delivery Method:
Operations and Maintenance (All Public Finance). Public Sponsor contracts for long term operations and maintenance of an existing facility, including non-capital repairs.

Warning!!!

You are about to delete: .

Confirm Deletion Cancel